Floor Insulation
Tingvej, Danemark, 2015
-
Excavate and fill with gravel mixture (dia: 5-8 cm) to a thickness of 10cm.
-
Pose a perforated tube (air drain dia: 4-6 cm) imbedded in gravel.
-
Add 5 cm of gravel (dia: 3-5cm)
-
Apply HES-mix on the gravel bed 15-20 cm.
-
Pose floor heating (if required).
-
Pose a 6 – 8 cm lime-sand mortar.